« February 2011 | Main | July 2011 »

April 2011 Archives

April 16, 2011

Shelters at Oklahoma Schools Survive Tornado

From the New York Times:

http://www.nytimes.com/2011/04/17/us/17tornado.html?hpw

EDI Identifies HVAC Problem at Mississippi School

During a tour of a Mississippi elementary school, the EDI staff noticed that a clerestory window had been closed from below. School officials said that gypsum board around the window had deteriorated because of moisture in the cafeteria. The building was always humid, particularly after rain storms.

Using a sheet of notebook paper, the EDI staff were able to determine that the make-up air fan on the kitchen exhaust hood was not working. Thus, when the hood was on, the cafeteria was under negative pressure, which pulls hot, moist air into the building during late summer and early spring. With the problem identified, the school district was able to take corrective action (i.e. the make-up fan was repaired) and moisture problems have ceased.

About April 2011

This page contains all entries posted to Educational Design Institute in April 2011. They are listed from oldest to newest.

February 2011 is the previous archive.

July 2011 is the next archive.

Many more can be found on the main index page or by looking through the archives.

Powered by
Movable Type 3.35